King Home Health Center - Boiler Installation

Objective: Unload and set two boiler systems into building basement.

Specialty Tasks:

  • Mount padeyes into ceiling to hang boilers during transition into building.
  • Pick boilers with carry deck crane.

Services Used: Rigging and machinery moving.


On this job the American Industrial Werks crew installed two new CFH Steam Boilers into the basement of the King Home Health Center in Evanston, IL. You can see from the pictures this was a fun job, as getting the boilers into the basement was a particularly tight squeeze. The crew used a carry deck crane to lower the boilers to the base of the first stairwell. Then using hoists and chain slings attached to padeyes mounted in the concrete ceiling the boilers were lowered down the second stairwell into the basement and dollied into position.

©2016 American Industrial Werks, Inc.   |   Site created by Thomas Web Solutions